| SNo. |
DESCRIPTION OF WORK |
CLIENT |
QTY |
LENGTH |
| 01 |
Contract #:SSGC/SC/TE-434/Cont-490/2005
Installation of 20" Diameter x 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Pat Feeder Canal (Completed)
2) Frontier Wah (Completed)
3) Naseer Wah (Completed)
4) Shahi Wah (Completed) |
SSGC |
1
1
1
1 |
596M Ø20"
|
| 02 |
Contract #:SSGC/SC/TE-600/Cont-602/2006
Installation of 16” & 20" Diameter x 0.375" & 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Begari Canal Crossing km 70 + 781 (Completed)
2) Rohri Canal Crossing mp 77 + 2100 (Completed)
3) KP East Crossing mp 77 + 2800 (Completed) |
SSGC |
1
1
1 |
140M Ø20"
363M Ø16" |
| 03 |
Contract #: PL/MANCH/8025/2005
Re-Routing / Byepass of Manchar Lake Segment of 16" Diameter x 0.5" Steel KMK Pipeline (API 5L-X46) at DADU
1) ARAL WAH 1 Crossing by HDD (Completed)
2) ARAL WAH 2 Crossing by HDD (Completed) |
PARCO |
1
1 |
|
| 04 |
Installation of submerged 24"dia x 0.469", 20"dia x 0.438" and 18" dia x 0.406" W.T, API5L Grade X70/ X60 high pressure Steel Gas Pipelines under canals/crossings using HDD method at the following locations (awarded)
1) Nusrat Branch (KM 136 + 188) 24" & 20" ØP/L Actual Qty 84+96=180M (completed)
2) Nara Canal (KM 39 + 57) 24" Ø P/L (Completed)
3) N.W. Canal (KM122 + 917) 20" 18"Ø P/L (Completed)
4) Begari Canal (KM 22 + 161) 18"Ø P/L (Completed) |
SSGC |
2
1
2
1
|
456M Ø24"
260M Ø20"
340M Ø18" |
| 05 |
Purchase Order #: 508384/55/05
Fateh Shah – 1 to Makhdumpur 4" Dia (Steel Casing)
Jafara Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
37M |
| 06 |
Purchase Order #: 508812/F5/05
Polyethylene Pipeline (4" Dia Steel Casing)
Pir Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
65M |
| 07 |
Order Reference #: SUN CNG 168/2006
12" Ø Steel Pipeline Crossing by HDD at Mehran Highway, Landhi, Karachi for 8" Ø Gas carrier pipe (Completed) |
SUN CNG Total Petrol Pump |
1 |
65M |
| 08 |
Ø 6" 0.25" W.T DN 150 Carbon Steel Pipeline (API5L Gr. B) RBOD Crossing at BHP Zamzama Phase – II Project, DADU (Completed) |
BHP/DESCON |
1 |
170M |
| 09 |
16" Diameter x 0.5" W.T MFM Pipeline (API5LX-46) crossing by HDD method at Upper Gogera Branch Canal, District Sheikhupura, Faisalabad (Completed) |
PARCO |
1 |
120M |
| 10 |
8" dia gas gathering lines between MD13 – 3 and MD 6 - 9 crossing underneath the Shah Minor Canal using Horizontal Directional Drilling (Completed) |
Mari Gas Co. Ltd |
2 |
152M |
| 11 |
Nirli Minor Canal crossing using Horizontal Directional Drilling for 20" dia gas pipeline for 175MW, CCPP at Daharki (Completed) |
Foundation Power Company Ltd |
1 |
84 M |
| 12 |
Crossing of Chandan Wah Canal at Johi Road for 8" 13% Cr. SS Duplex X-65 Gas Pipeline and Fiber Optic Cable/Conduit using Horizontal Directional Drilling System for ZAM – NORTH Pipeline Project (Completed) |
BHP |
3 |
330M |
| 13 |
Laying of 16" dia pipeline through HDD Method at Masu Wah Canal (Completed) |
FFC/Amtech |
1 |
75M |
| 14 |
Other various HDD crossings 6" to 20" Ø have been executed on different locations. |
|
Various |
550M |