ONGOING PROJECTS
| CLIENT |
NAME OF PROJECT |
|
| BHP PETROLEUM |
Provision of laying 8" x 20KM Pipeline |
more |
| BHP PETROLEUM |
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM |
more |
| FOUNDATION POWER COMPANY |
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant |
more |
| PAKISTAN PETROLEUM LIMITED PPL |
Laying of 6" Dia High Pressure Buried Gas Pipeline |
more |
| ENI Pakistan Limited |
Construction of 10" dia pipeline laying and associated works for 3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis |
more |
| BHP PETROLEUM |
Provision of Construction of Evaporation Ponds (Effluent waste Water System) |
more |
| BHP PETROLEUM |
Provision of Zam - 1 Rehabilitation Work of access road. |
more |
| BHP PETROLEUM |
Zam North Rectification Works |
more |
| BHP PETROLEUM |
Indus Highway Pipeline Crossing Protective Works |
more |
| ENGRO Fertilizers Ltd |
Construction of New 16" Dia Gas Line from Engro Fertilizers Ltd Plant site to Mari Gas Manifold-II |
more |
| ENGRO Fertilizers Ltd |
Construction of 14" Effluent Piping from D2 to E1 Pond |
more |
| Fotco Oil Terminal |
Construction of New Jetty (QP2) on Turnkey basis at Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
more |
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTDNAME OF PROJECT & LOCATION
Provision of laying 8" x 20KM Pipeline from Zamzama North Wellhead to Zamzama to BHP Gas
Processing Plant
PROJECT DESCRIPTION
- Fabrication, Installation & Commissioning of Duplex Steel Pipeline 8"dia beveled ends SMLS
W.T. 8.74mm, API 5LC (UNS S31803) Grade LC-65-2205 3L Polyproplyene Coated.
- Preparation of 10 to 15 meter wide ROW
- Supply of 50mm thick concrete coated line pipe as per relevant specs and drawings
- Trenching as per required depth and compaction of the trench bed by providing sieved sand
-Stringing, welding and 100% NDT
-Supply and installation of heat shrink sleeves for welding joints
-Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
- Commissioning Complete
-Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
-CP WORKS: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
-Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro tightening
-Installation of pipeline in Zamzama Plant
-Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
-Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
-Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
-Hydro testing of flowline as per specification
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT & LOCATION
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM from Zam B&D Wellheads to
BHP Gas Processing Plant
PROJECT DESCRIPTION
- Fabrication, Installation & Commissioning of 13% Cr. Steel Pipeline from ZAM B&D Wellhead to BHP's Gas Processing Facilities
- Pipe 10" x 12.7 w.t Beveled Ends API 5LC 13% Cr
- Pipe 8" dia Bevelled Ends w.t 9.7mm API 5LC 13% Cr. SMLS, 3LPPolyethylene Coated
- Preparation of 10 to 20 meter wide ROW
- Loading & Transportation of 3L PP Line Pipe and facotry made hot induction bend to site
- Trenching as per required depth to attain the profile of the flow line as per drawing
- Stringing, welding and 100% NDT
- Supply and installation of heat shrink sleeves for welding joints
- Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
- Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
- CP WORK: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
- Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro testing
- Installation of pipeline in Zamzama Plant
- Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
- Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
- Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
- Hydro testing of flow line as per specification
- Commissioning Complete
CLIENT: FOUNDATION POWER COMPANY LIMITED – DAHARKI
NAME OF PROJECT & LOCATION
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant Daharki
VALUE OF WORK
Rs. 342 Million
PROJECT DESCRIPTION
-Design, Survey, Engineering, Supply of Material - 20 " dia API 5LX-60 spiral welded pipe with 3 layer PE Coating
-Procurement of valve, pipe fittings, heat shrink sleeves, metering system, bends
-Civil Works, Transportation, Construction on existing ROW
-Launcher / Receiver System, Cathodic Protection, NDT Inspections, Security, Pipeline Pigging
-Commissioning Complete
CLIENT:PAKISTAN PETROLEUM LIMITED PPL
PIDC House, Dr. Ziauddin Ahmed Road Karachi
NAME OF PROJECT & LOCATION
Laying of 6" Dia High Pressure Buried Gas Pipeline from ADAM X-1 Well, Hala to
SSGCL's Tie-in Point Near Goth, JORO DERO
PROJECT DESCRIPTION
Construction & laying of 6" Dia Gas Pipeline, work includes
- Preparing 30 ft wide right-of-way (ROW)
- Excavation of 3 feet wide and 3 feet deep trench mostly in water logged areas
- Transportation of line pipe from Hala stores to site, visual inspection, repairing. beveled ends, discarding the pipe length, if damage is extensive and beyond repair pipeline inspection, stringing, cleaning the inside, construction/welding section tie-ins of the pipeline using pneumatic internal line up clamp, installation welding of all pipe fittings in accordance with API 1104 as per specification.
- Lowering without stressing the pipeline in the trench after coat and wrap/heat shrinkable sleeves application on welded joints.
- Backfill free of stone, bushes, stumps, and any material which could be detrimenal to the coating of the pipeline
- Backfill with imported earth, if excavated earth is not suitable
- Fab. & installation of Pig Launcher/Receiver, bypass spools and construction of RCC supports.
- Valves and Fittings; fabrication/erection of fittings of various sizes incl. transportation, painting
- Supply and installation of heat shrink sleeves.
- Inertization of the laid pipeline
- Installation including design of crossovers
- Hydrotest of the entire pipeline as per BS 31.3 and API 1110 (1800 psig) and commissioning
CLIENT:ENI PAKISTAN LIMITED
5th Floor, The Forum, G-20, Block-9,
Khayaban – e - Jami, Clifton, Karachi
NAME OF PROJECT AND LOCATION
Construction of Pipeline Laying and Associated Works for
3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis
PROJECT DESCRIPTION
EXHIBIT B-1 BHIT (KIRTHER AREA) & KADANWARI AREA
Mobilization of equipment/machinery, manpower & setting of temporary camp and other facilities as per project requirement.
CIVIL WORKS (FLOW LINE/PIPELINE)
. Supply & installation Flow line/Pipeline Markers
. Supply & install RCC cast in site barriers at road crossing in compliance with project specifications
• Supply, fabricate, construct/weld anchor flange and anchor blocks for the flow pipeline
• Construction of culverts at water channel crossings
• RCC slabs for heavy traffic passing
• Supply, fabricate & install Tie-in Pit for 24" Gathering and 10" Flow line
• FLOW LINE / PIPELINE INSTALLATION
• Cutting, filling, clearing trees and bush removing and grading as required of the pipeline ROW
• Excavation, line pipe end preparation, cutting beveling, welding, lowering & backfilling of Flow line / Pipeline 10", 12" dia SCH. 30S (22% Cr. Duplex SS) including preparation of field bends & 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100% radiography, PT, Holiday test etc.
• Flow line/Pipeline 10", 12" dia (Carbon Steel API 5LX – 60, 9.30mm thick, Seamless/SAW Longitudinal seam& 17mm thick, SAW/ERW, Longitudinal. 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100%radiography, PT, Holiday test etc.
• Flow line/Pipeline 24" dia (Carbon Steel API 5LX – 60, 12.7mm thick, Seamless/SAW Longitudinal seam 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100%radiography, PT, Holiday test etc.
• HS Sleeves installation for 10", 12", 24" dia Flow line (CS/Duplex SS) Installation of heat shrink sleeve width 17" & 34" cross-link polyethylene RAYCLAD WPC – 120 (Tyco/Raychem).
• Hydrotesting, pigging, gauging & cleaning of Duplex Pipeline 10", 12" & 24" dia as per project specifications.
• Installation/welding of CP cleats/connection lugs/stub on gas Flow line/Pipeline.
• Installation & connecting of T/R Unit, Solar Power Supply Unit, Anode junction box on pre-fabricated mounted structure, test station on pre-fabricated steel support, 2 No's ground bed including excavation & backfilling
• Installation & connecting of cables partially laid in cable trenches
• Installation & connecting of potential monitoring equipment comprising of voltmeter 2 No's permacell reference electrode and PVC cable.
CLIENT:BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Provision of laying 8" x 20KM 22% Crumium Duplex Stainless Steel Pipeline from Zamzama North Wellhead to Zamzama to BHP Gas Processing Plant
PROJECT DESCRIPTION
• Fabrication, Installation & Commissioning of Duplex Steel Pipeline 8"dia beveled ends SMLS
• W.T. 8.74mm, API 5LC (UNS S31803) Grade LC-65-2205 3L Polyproplyene Coated.
• Preparation of 10 to 15 meter wide ROW
• Supply of 50mm thick concrete coated line pipe as per relevant specs and drawings
• Trenching as per required depth and compaction of the trench bed by providing sieved sand
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
• Commissioning Complete
• Installation of DEHN SOHNE
• CP WORKS: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
• Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including
• hydro tightening
• Installation of pipeline in Zamzama Plant
• Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
• Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
• Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
CLIENT:BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM from Zam B&D Wellheads to BHP Gas Processing Plant
PROJECT DESCRIPTION
Fabrication, Installation & Commissioning of 13% Cr. Steel Pipeline from ZAM B&D Wellhead to BHP's Gas Processing Facilities
• Pipe 10" x 12.7 w.t Beveled Ends API 5LC 13% Cr.
• Pipe 8" dia Bevelled Ends w.t 9.7mm API 5LC 13% Cr. SMLS, 3LPPolyethylene Coated
• Preparation of 10 to 20 meter wide ROW
• Loading & Transportation of 3L PP Line Pipe and facotry made hot induction bend to site
• Trenching as per required depth to attain the profile of the flow line as per drawing
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
• Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
• CP WORK: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
• Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro testing
• Installation of pipeline in Zamzama Plant
• Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
• Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
• Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
• Hydro testing of flowline as per specification
CLIENT: FOUNDATION POWER COMPANY LIMITED - DAHARKI
NAME OF PROJECT AND LOCATION
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant Daharki
15KM long from Mari Deep Well to Power Station (near Mirpur Mathelo)
PROJECT DESCRIPTION
• Design, Survey, Engineering, Supply of Material - 20" dia API 5LX-52 spiral welded pipe
with 3 Layer PE Coating.
• Procurement of valve, pipe fittings, heat shrink sleeves, bends.
• Civil Works, Transportation, Construction on existing ROW.
• Launcher / Receiver System, NDT Inspections, Pipeline Pigging.
• Commissioning Complete.
• Cathodic Protection.
CLIENT: NIGERIAN GAS COMPANY LIMITED / SHAUKAT & RAZA (PVT) LTD.
Odin Road, Ekpan, P.M.B. 1288, Warri, Delta State. Nigeria, /
9th Floor, Rimpa Plaza, M. A. Jinnah Road, Karachi.
NAME OF PROJECT AND LOCATION
Re-Construction of Burnt Delta IV Metering Station, Ughelli-Nigeria
PROJECT DESCRIPTION
Part A. Design Engineering study & procurement services
Part B. Supply of imported material
• Supply of Gantry Crane, line break / ESTD valve, Material for repair of pressure
reduction system & metering skid , refurbishment of pig trap and 12" isolation full bore ball valve,
• Refurbishment parts of station outlet MOV (Motor Operated Valve) Instrument Gas skid, materials for Utility system,
• Telecommunication system, instrumentation & control system, CP Facility, fire detection and protection system. Supply of calorimeter, densitometer, materials for interconnecting piping, fittings etc.
• Supply of Valve, Valve actuators & relief valves.
• Supply of Control panel, UPS system complete.
Part C. Construction
• Re-construction of pipeline including installation of 12" (600 #) and 20"(300 #) insulating joints,
• Re-construction of Cathodic production system.
• Construction of complete Civil Infrastructures & Control building of the metering station including road, guardhouse etc.
• Construction of process facilities.
• Constriction of all utility systems.
• Construction of Electrical & Instrumentation of the metering station.
• Refurbishment & Reconstruction of pressure reduction skid, metering Skid & pig trap.
• Provision of site accommodation, messing and radio communication system
• Construction of station inlet 10" ESD / line break valve, Construction of instrument
gas system.
All field instrumentation and control system & integration with existing heaters,
• Filter separator & slop tank.
• Construction of Calorimeter, densitometer, control panel & UPS system
• Construction of all skid interconnecting piping, automatic flooding & fire extinguishing
• System (FM 200 / INERGEN)
• Utility system, instrumentation cabling and junction boxes, insulating joints, earthing system,
• Painting & reconstruction of existing roads.
• Dismantling of existing bypass facility and hooking up of newly installed facilities.
• Pre-commissioning & commissioning
CLIENT: PAK-ARAB REFINERY LIMITED
St-4/B, Block-14, Sir, Shah Suleman Road, Gulshan-e-Iqbal,
Karachi.
NAME OF PROJECT AND LOCATION
16" dia MFM Pipeline Crossing by HDD Method of Upper Gogera Branch
Canal at District Sheikhupura.
PROJECT DESCRIPTION
• Shifting all material from PARCO warehouse Sheikhupura to Machike Terminal Station, Sheikhupura including loading/unloading.
• Excavation, dewatering, welding of line pipe, bends and other fittings, hydrostatic testing & fabrication of spools.
• Cold cutting of existing 16" Ø pipeline for tie-in with new line, oil retrieval / collection from the pipeline before cold cut.
• Installation of 16" dia x 0.5" W.T. pipeline, 120M long, with a minimum of 3 meter curve under canal bed at RD 150+200 using Horizontal Directional Drilling Method
• Removal/dismantling of cut pipe spool, removal of piles & pile caps of existing overhead crossing
• Final tie-in, welding with existing underground oil pipeline, priming and coating of welded joints with heat shrink sleeves including tie-in joints, bends, pipe and fitting repairing.
CLIENT: SUI SOUTHERN GAS COMPANY LIMITED
ST-4/B, Block -14, Sir Shah Suleman Road, Gulshan -e- Iqbal
Karachi.
NAME OF PROJECT AND LOCATION
Installation of 16" & 20" diameter Submerged high pressure gas pipeline under canals/crossing.
Drilling System.
PROJECT DESCRIPTION
Installation of 16" & 20" dia high pressure steel gas pipeline under canal by Horizontal Directional Drilling System.
Contract No: SSGC/SC/TE-600/Cont-/2006
a. Rohri Canal Crossing MP 77+2100
• Transportation of 16 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of pipeline for HDD crossing.
• Drilling the horizontal directional, bore under the canal bed and installation of Pre-tested 16 inch dia. Pipeline crossing section with bends etc.
b. KP East Crossing MP 77+2800
• Transportation of 16 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of pipeline for HDD crossing.
• Excavation, dewatering, welding of line pipe, bends and other fittings, hydrostatic testing & fabrication of spools.
• Cold cutting of existing 16" Ø pipeline for tie-in with new line, oil retrieval / collection from the pipeline before cold cut.
• Installation of 16" dia x 0.5" W.T. pipeline, 120M long, with a minimum of 3 meter curve under canal bed at RD 150+200 using Horizontal Directional Drilling Method.
• Removal/dismantling of cut pipe spool, removal of piles & pile caps of existing overhead crossing.
• Final tie-in, welding with existing underground oil pipeline, priming and coating of welded joints with heat shrink sleeves including tie-in joints, bends, pipe and fitting repairing.
c. Begari Canal KM 70 + 781
• Transportation of 20 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of
pipeline for HDD crossing.
• Drilling the horizontal directional, bore under the canal bed and installation of Pre-tested
20 inch dia. Pipeline crossing section with bends etc.
CLIENT: ENGRO FERTILIZERS LIMITED
NAME OF PROJECT AND LOCATION
14" Cross Country Piping from D2 to E1 Pond at Daharki
PROJECT DESCRIPTION
• Welding, excavation, laying, coating wrapping on joints, holiday testing, backfilling, and restoration if excavated area for 14" CS, SCH. 20 pipeline from D2 to E1 pond.
• Road crossing (Open Cut)
• Road crossing (Thrust Bore Cut)
• Acquisition of land (width of land required 20ft)
• Design, procurement, Installation and commissioning of sacrificial type CP System
• Provide supports for above ground piping complete in all respect
• Provide anchore blocks and anchor flanges on line
• Hydrotesting of complete piping system
• Sandblasting, primer application and painting of above ground piping as per Efert standards
• Detailed engineering
CLIENT: ENGRO FERTILIZERS LIMITED
NAME OF PROJECT AND LOCATION
NEW 16" GAS PIPELINE PROJECT AT DAHARKI
PROJECT DESCRIPTION
• Survey and Pipe line locating: Installation pipeline markers on existing pipeline and locating temporary markers for New 16" dia Pipeline.
• Detailed engineering & Design
• Procurement / supply of B12 dia 3 Layer Polyethylene
• Fabrication, welding, stringing & laying of pipeline including excavation & dewatering etc
• providing and fixing anchor blocks, buoyancy weight
• Road and canal crossings thru Horizontal directional Drilling (HDD)
• Providing and installation of fittings, valves, heat shrink sleeves, insulating joints & insulating flange kits etc
• providing and installation of Pressure Relieve Valves and Gauges etc.
• NDT complete including hydrotesting & Pigging of Pipeline
• Providing & installation of Hot Tap tee 12" x 12" x 12" including Hot Tapping activity
• Providing and installation of Pig Launcher & Receiver complete including quick closure.
• Providing and installation of Cathodic Protection system
• Civil Work: trench weight, foundations, supports, pits & anchor etc
• Hydro testing and commissioning complete of flowline as per specification
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Provision of Construction of Evaporation Ponds (Expansion of Waste Water System) including the following activities
PROJECT DESCRIPTION
Excavation, earth filling of embankment with suitable material, compacted, sand filling on bed and inner slopes, bettar protection with 2" concrete, brick & grouting. Excavation of AG drains, providing and spreading of 10mm crushed stone. Providing and fixing of geo textile inside AG drains, providing and fixing of 90mm UPVC "slotted & plain" pipe including fittings. Construction of AG pits/valve pits including all civil works abd fixing of covers. Providing and fixing of 0.2mm thick polythene sheet below sand bedding and inside slopes of the E-ponds. Supply and welding HDPE pipe 200mm dia x 150M, supply of 12" steel pipes for thrust bore casing precoated, welding the 12" pipes and joint coating. Inserting the 200mm dia HDPE pipe & PVC conduit 300mm dia for electric cable including excavation and backfilling.
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Provision of Zam - 1 Rehabilitation Work
PROJECT DESCRIPTION
Work includes: Dewatering / repair ZAM 1. Providing and laying 1ft-4" deep boulders, pit sand. Providing and laying gravel 1ft depth.
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Zam North Rectification Works
PROJECT DESCRIPTION
Work includes: Dewatering, slush remocval, providing and spearding stone / boulders, gravel and pit sand. Road scarifying, leveling and compacting. Providing and fixing pipe culvert single pipe dia 45cmx 12M, pipe culvert three pipes dia 45cmx12M. Repair construction of parapet walls of the existing culverts located at different locations.
Zamzama North and East FP Pund: Repair of breaking secetion of wall damaged due to flood. Construction of new bricks masonry wall. Filling silt/clay in bottom of bettar protection where flood has eroded section of FP Bund. Hand compacting newly filled material in bottom of bettar protection. Filling cuts, voids, cracks on the inside slope of the bund. Manually compacting newly spread material on top of the bund. Chipping off concrete to clear cracks in bettar protection, filling cracks with cement-sand mortar ratio 1:3
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Indus Highway Crossing Repair Work.
PROJECT DESCRIPTION
Work includes: Excavation in natural ground 1'-4" deep, 4' wide and 100ft long. Providing and fixing precast RCC slab. Backfilling with manual compaction on top of precast slab.
CLIENT: FOTCO OIL TERMINAL
NAME OF PROJECT AND LOCATION
CONSTRUCTION OF NEW JETTY (QP2) ON TURNKEY BASIS AT FOTCO OIL TERMINAL
PROJECT DESCRIPTION
• Mobilization of all Equipment and Manpower at site
• Construction and maintenance temporary works / facilities
• Additional Survey, Geophysical, Geotechnical Investigations and Hydrographic Investigation (If required)
• Engineering and Detail Design
• Supply of materials, prepare shop drawings, construction etc
• Test on completion for all Equipments of Oil Terminal
• Test after Completion
• Documentation
• Supply of two (2 nos.) vehicles for Employer / Employer's Representative with all requirements as per specifications
• Demobilization
• Procurement and Supply of Equipment at Site
• Supply of Spares & tools, inspection visits and training (both local and foreign)
EXECUTED PROJECTS
| CLIENT |
DESCRIPTION |
LENGTH |
YEAR |
|
| ENI PAKISTAN LIMITED |
Construction of Pipeline Laying and Associated Works |
|
|
more |
| BHP PETROLEUM |
Provision of laying 8" x 20KM 22% Crumium Duplex Stainless Steel Pipeline |
|
|
more |
| BHP PETROLEUM |
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM |
|
|
more |
| FOUNDATION POWER COMPANY |
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant |
|
|
more |
| NIGERIAN GAS |
Re-Construction of Burnt Delta IV Metering Station |
|
|
more |
| CLIENT: PAK-ARAB |
16" dia MFM Pipeline Crossing by HDD Method |
|
|
more |
| SSGC |
Installation of 16" & 20" diameter Submerged high pressure gas pipeline |
|
|
more |
| ENGRO FERTILIZERS LIMITED |
14" CROSS COUNTRY PIPING FROM D2 TO E1 POND AT DAHARKI |
|
|
more |
| Expansion of Waste Water System |
Provision of Construction of Evaporation Ponds (Expansion of Waste Water System) including the following activities |
|
|
more |
| Provision of Zam |
Provision of Zam - 1 Rehabilitation Work |
|
|
more |
| Zam North Rectification Works |
Work includes: Dewatering, slush remocval, providing and spearding stone / boulders, gravel and pit sand. Road scarifying, leveling and compacting |
|
|
more |
| Indus Highway Crossing Repair Work |
Zamzama North and East FP Pund: Repair of breaking secetion of wall damaged due to flood. Construction of new bricks masonry wall. |
|
|
more |
| CONSTRUCTION OF NEW JETTY |
CONSTRUCTION OF NEW JETTY (QP2) ON TURNKEY BASIS AT FOTCO OIL TERMINAL |
|
|
more |
| ENI Pakistan Limited |
Construction of 10" dia pipeline laying and associated works for 3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis |
|
|
more |
| BHP Petroleum (Pakistan) Pty. Ltd. |
Provision of Construction of Evaporation Ponds (Effluent waste Water System) |
|
|
more |
| BHP Petroleum (Pakistan) Pty. Ltd. |
Provision of Zam - 1 Rehabilitation Work of access road. |
|
|
more |
| BHP Petroleum (Pakistan) Pty. Ltd. |
Zam North Rectification Works. |
|
|
more |
| BHP Petroleum (Pakistan) Pty. Ltd. |
Indus Highway Pipeline Crossing Protective Works |
|
|
more |
| ENGRO Fertilizers Ltd. |
Construction of New 16" Dia Gas Line from Engro Fertilizers Ltd Plant site to Mari Gas Manifold-II |
|
|
more |
| ENGRO Fertilizers Ltd. |
Construction of 14" Effluent Piping from D2 to E1 Pond |
|
|
more |
| Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
Construction of New Jetty (QP2) on Turnkey basis at Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
|
|
more |
| PARCO |
Inspection Services for Coating and Wrapping of 16" Ø Crude Oil Pipeline at Mahmood Kot. |
11 Km |
1981 |
|
|
Hydrostatic Testing 16" Ø Oil P/L 203-258 Km (Mancher Lake to Phulji). |
55 Km |
1981 |
|
|
Water Filling & Hydrostatic Testing (2,100psi) of 16" Ø Crude/Oil P/L. |
50 Km |
1981 |
|
|
Excavation of Trench for 16" Ø Oil Pipeline in all kinds of Soil, Rock blasting Karachi to Dadu Section. |
100 Km |
1981 |
|
|
Transfer Oil Pipeline 20" Ø - 7.8 Km. Keamari to Korangi. |
7.8 Km |
1982 |
|
| SNGPL |
16" Ø cross country U/G Gas Transmission P/L upto Sargodha. |
60 Km |
1983 |
|
| SGTC |
18" Ø Gas Pipeline 412 Meter long under ground and partial O/H across 2 Nalas over 8 Piles near Sui Field. |
412 Meter |
1997 |
|
| WAPDA |
20" Ø Transmission High Pressure cross country under ground Gas Pipeline Mari-Guddu-Kandhkot including crossings. |
60 Km |
1986 |
|
| AKUH |
Replacement of 8" Ø Main Gas P/L. Hot Tapping for bye-pass line. |
800 Meter |
1989 |
|
| ENGRO |
Const. of 12" Ø Feed Gas P/L from Minifold to Plant at Well # 6. |
11.4 Km |
1993 |
|
| MGCL |
Dist. Gas P/L 1" Ø to 3" Ø long in Staff Housing Colony, Daharki. |
13.5 Km |
1993 |
|
|
Gas Gathering Pipeline 20", 16", 10", 8" & 6" Ø in Mari Gas Field. |
48.3 Km |
1993 |
|
| OGDC |
Gas Gathering P/L 30",26",14",10" & 8" Ø in Qadirpur Gas Field. |
30 Km |
1996 |
|
| FFC |
Pigging of 16" Ø Gas Pipeline Plant to Off-Take. |
50 Km |
1996 |
|
|
Pigging of 14" Ø Gas Pipeline. |
49 Km |
1997 |
|
|
Re-routing of 16" dia Natural Gas Pipeline at Rainee Canal Crossing |
27 Km |
2007 |
|
|
Re-routing of dia 14" Natural Gas Line at Ranee Canal Crossing. |
|
2006 |
|
| SICON |
12" Ø Gas Transmission P/L Qadirpur-Liberty Power Plant Daharki. |
30 Km |
1998 |
|
| FOTCO |
Construction of White Oil handling facility at FOTCO existing jetty, Port Bin Qasim, Karachi. |
4 Km |
2001 |
|
| GNL/S&R |
EPC Project 14", 8", 6", 4" & 3"Ø Gas Pipeline Distributino to Ikeja Industrial Consumers, Ikeja - Nigeria |
10 Km |
2001 |
|
|
EPC Project 6", 4" & 3"Ø Ikeja 1A Extension, Ikeja - Nigeria |
26 Km |
2002 |
|
| PRL |
Re-routing of 6"Ø Jet A-1 Pipeline |
7.6 Km |
2001 |
|
| UTP/BP |
8" Ø Gas Pipeline 16,000 ft. Dhabi North to Mazari Main Field. |
4.9 Km |
1998 |
|
|
6" Ø Pipeline 46,000 ft. from Makhdumpur to Turk Facility. |
14 Km |
1999 |
|
|
Const. of 8"Ø flowline from Sonro-01 to Mazari Facility |
7000 ft. |
2002 |
|
|
Const. of 4"Ø flowline from Sonro-03 to Sonro Remote Facility |
3000 ft. |
2002 |
|
|
Const. of 4"Ø trunkline from Sonro-6 to Sonro Remote Facility |
3500 ft. |
2002 |
|
| PPL |
10" dia factory coated line pipe replacement section of aboveground GGM with buried pipeline at Kandhkot for PPL |
3100 M |
2007 |
|
|
WATER PIPELINE (200 KM) |
|
|
|
| KDA |
Construction of 66" Ø Twin steel pipe rising Main (100 mgd) including Fabrication of pipe. |
2 Km |
1981 |
|
| EXXON |
Laying 6" Ø Water Supply Pipeline at Daharki Plant. |
3 Km |
1981 |
|
| WASA |
Laying Ductile Iron Water Pipeline 150 mm to 400 mm Ø 50 Km in Rakhsan Housing Scheme, Quetta. |
50 Km |
1982 |
|
| DHA |
Laying M.S. Pipeline 16" to 36" Ø - 800 Meter in S.T.P. |
800 Meter |
1997 |
|
|
Laying Water Supply Transmission and Distribution 6" to 24" Ø M.S. Pipeline and 4" to 12" Ø A.C. Pipeline. |
60 Km |
1993 |
|
|
Refurbisment of 24" dia wate line at malir River Crossing for DHA |
1,600 RM |
2006 |
|
| KWSB |
72" Ø M.S. Twin Pipeline alignment and welding Pipri to North East Karachi - 7,540 Meter (Contract W-8). |
7.6 Km |
1993 |
|
| OGDC |
8" Ø Water Pipeline laying at Thora Tando Alam. |
29 Km |
1994 |
|
| UTP |
Laying Fire Water Pipeline under ground 12" Ø 4,000 Meter. |
4 Km |
1990 |
|
|
Laying 4" Ø SWD Pipeline 16,000 ft. in Badin Oil Field. |
4.9 Km |
1996 |
|
| ENGRO |
Water supply network of 6" to 16" Ø Pipeline - 20,000 ft. at Chemical Fertilizer Plant Daharki. |
6.1 Km |
1993 |
|
|
Laying 12" Ø Effluent P/L 11,000 ft. upto Mahiwah Daharki. |
3.35 Km |
1996 |
|
| FFC |
Pigging existing 20" Ø Water Pipeline 8 Km at Goth Machi. |
8 Km |
1996 |
|
| KSEW |
Cooling Water Pipe 84", 60" & 36"Ø Sandblasting, Coating and Wrapping at Lalpir Power Plant. |
761 Meter |
1996 |
|
| SHELL |
Laying 12" Ø Fire Water P/L 2 Km at Machike incl. 4 Hydrants. |
2 Km |
1997 |
|
| SHYDO |
Const. of Penstock 820 mm Ø in Tunnel - 2,130 Meter |
2.5 Km |
1998 |
|
| EPTL |
Laying 14", 12", 8" & 6" Ø 3 Km Fire Water Line at I.L. Chemical and Storage Tank farm at Port Qasim. |
3 Km |
1999 |
|
|
PIPELINE CROSSINGS ( 15 KM ) |
|
|
|
| WAPDA |
Across River Indus GUDDU BARRAGE - 20" Ø Gas P/L Crossing. |
1.5 Km |
1986 |
|
| SSGC |
Across River Indus KOTRI BARRAGE - 18" Ø Gas P/L Crossing. |
1.17 Km |
1990 |
|
|
Across River Indus STEEL BRIDGE - Erection of Bridge Steel Structure over Piled peir near Jamshoro. |
750 Meter |
1995 |
|
|
Across River Indus STEEL BRIDGE - 20" Ø Gas P/L Crossing. |
750 Meter |
1995 |
|
|
Across River Indus (Flood Plane Area) Piled Over Head - 20" Ø Gas Pipeline crossing. |
850 Meter |
1995 |
|
| PARCO |
Across River Malir O/H on Piles (167 Nos.) - 20" Ø Oil P/L X-ing. |
2.6 Km |
1990 |
|
|
16" dia MFM Pipeline Crossing by HDD Method of Upper Gogera Branch Canal at District Sheikhupura |
|
2007 |
|
| KWSB |
Horizontal Boring & Jacking 84" Ø M.S. Twin Casing Pipe for 72" Ø Water Pipeline Crossing under existing Twin Concrete CONDUIT 26' below ground level. |
54 Meter |
1996 |
|
| OGDC |
Emergency Work of 26"Ø gas pipeline crossings over Rabi canal at Dera Murad Jamali. |
550 ft. |
2001 |
|
| TULLOW |
Rainee and Fakir Wah Canal Crossing at 8" dia SARA Gas Pipeline |
110 M |
2007 |
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
Well Head Connections, Manifold/Assemblies, Piping, Fabrication, Installation of Dehydration/Separator/Condensate and other Process Plants incl. Piping, Instrumentation, Metering and Solar Electrical Installation. |
|
|
|
| SGTC |
Mechanical and Civil Construction: Fabrication, Erecetion and Piping works including Foundations. |
|
|
|
|
OIL PUMPING (BOOSTING) STN. at Bubak |
|
|
|
| PARCO |
Construction of Civil, Mechanical and Electrical works. Piping and Metering. 3 Nos. Vertical Turbine Pumps 9 MGD. Surge Controller anticipator valves. RCC framed structure SHED (33x7x6.5 m), RCC floor slab. Corrugated asbestos sheet roof on steel trusses. Guntry Crane on extended brackets from columns. |
|
1993 |
|
|
W/S DISTRI. PUMPING STN. WW 1, 2, 3, 4 & 5 (5 Stn.) |
|
|
|
| DHA |
Fabrication, Erection and Piping work 8" to 12" Ø pipes at WW 1 to WW 5 incl. Manifolds, Intake & offtake, Foundation and supports. Installation of Pumps, Turbine type Valves, Water Meter and Electrical installation and Electrical Panel Boards etc. and Commissioning. Repair of Pump House, valve chambers etc. |
|
1989 |
|
|
W/S BOOSTING PUMP STN. at Chakra Goth |
|
|
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
Repair/Modification of RCC framed structure Pump House 20 x 20 m x 5.3 m Floor Slab Walls and Columns, 24" Ø Transmission Pipeline Interconnection. Fabrication Installation of 24" Ø manifold for 3 Turbine Pumps, Inlet and discharge Pipelines. Installation of 3 Nos. Turbine Pumps 2300 GPD along with all piping hookups, 24" Ø Intake and offtake pipeline, valves and other fittings. |
|
1991 |
|
|
DEVELOPMENT IN EXISTING PUMPING SYSTEM |
|
|
|
|
Design, Construct, Piping Interconnections/Mainifold and Other Mechcanical works of distribution Pumping System at WW1, 2, 3, 4 & 5 during 1988 to 1995. |
|
1995 |
|
|
PLANTS/FACILITIES & PIPING ETC. |
|
|
|
| PSMC |
Fab./Installation of Steel Structure and Erection of 36' Ø Chimney, 150' high. |
|
1982 |
|
|
PLANTS/FACILITIES & PIPING ETC. |
|
|
|
| KESC |
Re-circulation system of 2 Nos. Fuel Oil Storage Tanks at KTPS, Oil Pumps & Piping ½" & 2" Ø 500 ft. Valves, Fittings & Electrical Control Panel etc. |
|
1986 |
|
| UTP |
Bukhari Compression Facility Civil work Pile Foundations, Groutings, Grating etc. in Badin Oil/Gas Concession. |
|
1997 |
|
| |
Sluge Catcher Twin Pipe 36" Ø 440' long each, Installation, Fabrication, Welding, Sandblasting and Painting at Bukhari and Golarchi Facilities. |
|
1997 1998 |
|
| SHELL |
Construction and Testing of In-Plant Piping (3.7 Km) and Equipment installation works at Machike including 12"Ø fire water alarm system with hydrants (2 Km) |
|
1997 |
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
SEWERAGE TREATMENT PLANT (2 NOS.) |
|
|
|
| DHA |
Design Construct Piping & Other Mechanical works. |
|
1997 |
|
|
Grit Chamber,Primary and Secondary Clarifier, Sludge Digester and Sludge Tank.Sludge Drying Bed.Effluent Tank, Chlorination Station, Aeration Tank, Tanker Filling Station, Sludge Pumps, Effluent Pumps, Installation of other Pumps, Parking and Ancillaries Facilities, All Mechanical inc. Structure & Aerator Supply and installation of Pumps. |
|
|
|
|
OIL STORAGE STEEL TANKS (7 Nos.) |
|
|
|
| WAPDA |
Design, Const., Civil, Mechanical,Farbrication/Erection & complete installation At Steam Power Station, Faisalabad. |
|
1984 |
|
|
2 Nos. Oil Storage Tanks (75' Ø 24' high) 2500 Tons each incl. Foundation U/G Decanting RCC tank 60' x 20' x 10', Oil pumps 7500 GPM @ 250 psi. |
|
|
|
|
Three system with steam heating coil and level indicator. |
|
|
|
|
FIRE FIGHTING WATER SYSTEM (4 Locations) |
|
|
|
| UTP |
Khaskheli facility 12" Ø P/L 4,000 Meter 18 Nos. Hydrants,Valve, Fire handling etc. |
|
1990 |
|
|
STEEL BRIGDES CONSTRUCTION (6 Nos.) |
|
|
|
| SSGC |
Designed modified existing Structure (Members), Fabricated and Installed STEEL STRUCTURE TRUSSES (BOX GARDER) 4,444 ft. on Kotri Barrage structure to hold (elevated) Loops 100' x 24 feet each at 3 Locations for 18" Ø P/L crossing. |
|
1990 |
|
| SSGL |
NEW STEEL BRIDGE Across River Indus (near Jamshoro) |
|
|
|
|
Design, Fabricate and Install STEEL STRUCTURE TRUSSES over Pile Peir for 18" Ø Gas Pipeline crossing 750 Meter length. |
|
1996 |
|
|
STEEL BRIGDES CONSTRUCTION (6 Nos.) |
|
|
|
| SSGL |
Design, Fabricate STEEL TRUSS BRIDGE laid over piles (28 Meter Span) Across Nala for 18" Ø Hp Gas Pipeline crossing near Sui Field. |
|
1997 |
|
| UTP |
Fabrication/Erection STEEL GIRDER BRIDGE over 5 Nos. 70' span (350' long) Across LBOD (Keyhole-01). |
|
1997 |
|
|
CEMENT MORTAR LINING (34 Km) - Cost 10 Million |
|
|
|
| KESC |
M.S. Water Pipeline at Port Qasim 12" Ø................................700 Meter |
|
1989 |
|
| KWSB |
M.S. Water Pipeline 54" Ø.............................100 ft. |
|
1989 |
|
| DHA |
24" Ø M.S. Pipeline..................................12,000 Meter |
|
1989 |
|
|
18" Ø M.S. Pipeline...............................11,800 Meter |
|
1989 |
|
|
12" Ø M.S. Pipeline..........................................5,500 Meter |
|
1989 |
|
|
6" Ø M.S. Pipeline.............................................1,500Meter |
|
1989 |
|
|
6" to 36" Ø M.S. Pipe laid in Sewerage Treatment Plant..800 Meter |
|
1996 |
|
| PARCO |
4" to 12" Ø M.S. Pipe liad in Sewerage Treatment Plant.1,600 Meter |
|
1999 |
|
|
CANAL GATES (130 Gate) - Cost 10 Million |
|
|
|
| WAPDA |
Rehabilitation/Improvement PAT FEEDER CANAL RD: 177 MILE |
|
1996 |
|
|
New Radial / Vertical Gates 3 x 4 Meter............................8 Gates |
|
|
|
|
Radial Gates Raising 0.6 Meter & repairing...................61 Gates |
|
|
|
|
Vertical Gates Raising 0.6 Meter & repairing.................22 Gates |
|
|
|
| PSM |
Sea Water Canal Gate 6m x 12m vertical........................1 Gate |
|
1989 |
|
|
Intake Bulk Head 3m x 6m vertical.........................2 Gates |
|
1981 |
|
| KDA |
Water Supply Canal Gate (COD Hill) vertical..................1 Gate |
|
1982 |
|
|
Mulla Channel Gandawa.................................4 Gates |
|
1992 |
|
| BMID |
Hub Dam - Channel............................1 Gate |
|
|
|
|
Wuch Mangai Pilot Scheme Canal Gate......................4 Gates |
|
1990 |
|
|
Pelar Perennial Irrigation Scheme Canal Gate ..................4 Gates |
|
1990 |
|
|
Sorh Perennial Irrigation Scheme Channel Gate..........3 Gates |
|
1990 |
|
|
Gachina Perennial Irrigation Scheme Channel Gate..........2 Gates |
|
1992 |
|
| SHYDO |
Hydel Project Penstock/Transfer Pipeline Control Gate. 17 Gates |
|
1998 |
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
| PARCO |
Fabrication, Installation & Welding of Split Sleeves on 16" Ø P/L RD:(164 - 170). Trench Excavation and Backfilling |
120 ft |
1986 |
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
|
Fabrication, Install and Weld Split Sleeve in section I, II, III and IV from Karachi to Mahmood Kot. |
580 ft. |
1997 |
|
|
Fabrication Installation and Welding Split Sleeve on 16" Ø Main Oil Pipeline from Karachi to Mahmood Kot in Section I to IV. |
268 ft. |
1998 |
|
|
IRRIGATION PROJECTS |
|
|
|
| WAPDA |
CANAL CONSTRUCTION CRBC Contract No.60 at D. I. Khan |
|
|
|
|
Construction of Chashma Right Bank Canal RD; 175-210, Capacity at Hd 5,000 cusec, Bed width 40', Top width 100', depth 14', Embankment (Earth Fill) 75,000 cu. yd., Brick Lining 4" thick on side slopes and bed 320,000 sq. yd., Foot-Bridge 2 Nos. |
|
1985 |
|
|
CANAL CONSTRUCTION CRBC Contract No.83 at D. I. Khan |
|
|
|
|
Construction of Chashma Right Bank Canal RD; 000+210, Cross drainage RCC structures, stone pitching 1,500 ft2., Earth filling for embankment 20,000 cu. yd. |
|
1986 |
|
|
|
|
|
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
| BMIAD |
WUCH MANGAI PILOT SCHEME at Pishin |
|
|
|
|
Artificial Ground Water Recharge Ponds Scheme designed to divert flood flows from the Wuch Mangai Nullah into a series of Recharge ponds, A gabion bifurcation spillway above the main weir, An 85' stone masonry weir across the Wuch Mangai Nullah with a 44.5' wide off-take and 6' scour sluice, 500' long plain concrete off-take channel, 576' x 175' x 13' high compacted earth storage reservoir with spill channel and bottom outlet, 5,000' long plain concrete and masonry conveyance channel, Three recharge ponds, each 600' x 100' x 8' deep with spillway, Housing for monitoring works, Gates vertical 4 Nos. |
|
1990 |
|
| BMIAD |
PELAR PERENNIAL IRRIGATION SCHEME at Khuzdar |
|
|
|
|
Construction of RCC weir 300' long and under sluice 2 Nos. gated 5' span each, RCC intake conduit 3' x 3' gated 1,000' long, Open lined channel 22,200 ft. long, Aqueducts, check and check-cum-draw, check-cum-nuccas, ractangular nuccas and culverts, Gates Vertical 4 Nos. |
|
1990 |
|
|
SORH PERENNIAL IRRIGATION SCHEME at Zhob |
|
|
|
|
River diversion for construction of intake channel 3.25 cusecs-155' long upto well, Constructin of 8' Ø stone masonry sump well 42' deep, Irrigation channel and other tributaries 217,500' long. Earthen channel 86,750' and Lined channel 130,750', Water lifting arrangement by diesel engine driven pump 6" x 5", Canal head regulator, check-cum-scape, check-cum-nuccas, check-cum-drop, pipe chulverts (slab/pipe type) etc., Gates vertical 3 Nos. |
|
1990 |
|
| BIMAD |
GACHINA PERENNIAL IRRIGATION SCHEME at Harnai |
|
|
|
|
Rehabilitation of existing weir by repairing bed at U/S and D/S for controlling seepage, Construction of of sluice and in-take channel with proper steel gate arrangements, Lining of channels with 6" thick CC, Construction of Super passages, road culverts, aqueducts and other structures and also a hut for operators, Gates vertical 2 Nos. |
|
1992 |
|
| CGC |
PAT FEEDER CANAL IMPROVEMENT PROJECT at D.M.J. |
|
|
|
| WAPDA |
Modification/Repair of Canal, Regulators and Gate RD;00-177, Manufacturing Radial/Vertical Gates 64 Nos., Installation, Sandblasting and Painting, Rehabilitation/Repair of Apron works at D/S of regulators, Widening canal bed & dredging about 3' depth by (Beaver-600) Dredger, Sheet Piling, Laying Geotextile Sheets and Placing Stone Filter Bed, Stone Pitching at side slopes, Repair to bed pavements, peirs, wing walls and embeded parts by cement concrete and brick masonry work, Construction of Shed, Compound Walls and complete Workshop with all facilities, Office Block, Residential colony (Quarters and Bungalows), Camp and Mess Buildings, street lighting and colony roads, abulation block, water supply and sewage disposal arrangements. |
|
1996 |
|
| NDP |
Linning of Noshera Channel Rehbilitation Sub-Project in District Jhal Magsi, District Baluchistan |
|
2007 |
|
| Zamzama Gas |
Provision of laying 8" x 20km Pipeline from Zamzama North Wellhead to Zamzama Gas Processing Plant |
|
2010 |
|
| Zamzama Gas |
Provision of laying 10" x 5.6 km Pipeline from Zamzama B&D infill wells to Zamzama Gas Processing Plant |
|
2010 |
|
LARGE DIAMETER HORIZONTAL
DIRECTIONAL DRILLING
Construction contracts - design, labour, equipment and
all technical requirements for installation of up to 24"
dia Steel Pipe x 300M long using Horizontal
Directional Drilling including fabrication
of pipeline crossing with bends & tie-in to existing
systems.
HDD EXPERIENCE
| SNo. |
DESCRIPTION OF WORK |
CLIENT |
QTY |
LENGTH |
| 01 |
Contract #:SSGC/SC/TE-434/Cont-490/2005
Installation of 20" Diameter x 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Pat Feeder Canal (Completed)
2) Frontier Wah (Completed)
3) Naseer Wah (Completed)
4) Shahi Wah (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
1
1
1
1 |
220M
100M
120M
156M
|
| 02 |
Contract #:SSGC/SC/TE-600/Cont-602/2006
Installation of 16” & 20" Diameter x 0.375" & 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Begari Canal Crossing km 70 + 781 (Completed)
2) Rohri Canal Crossing mp 77 + 2100 (Completed)
3) KP East Crossing mp 77 + 2800 (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
1
1
1 |
140M
243M
120M |
| 03 |
Contract #: PL/MANCH/8025/2005
Re-Routing / Byepass of Manchar Lake Segment of 16" Diameter x 0.5" Steel KMK Pipeline (API 5L-X46) at DADU
1) ARAL WAH 1 Crossing by HDD (Completed)
2) ARAL WAH 2 Crossing by HDD (Completed) |
Pak Arab Refinery Company Ltd (PARCO) |
1
1 |
168M
132M |
| 04 |
Installation of submerged 24"dia x 0.469", 20"dia x 0.438" and 18" dia x 0.406" W.T, API5L Grade X70/ X60 high pressure Steel Gas Pipelines under canals/crossings using HDD method at the following locations (awarded)
1) Nusrat Branch (KM 136 + 188) 24" & 20" ØP/L Actual Qty 84+96=180M (completed)
2) Nara Canal (KM 39 + 57) 24" Ø P/L (Completed)
3) N.W. Canal (KM122 + 917) 20" 18"Ø P/L (Completed)
4) Begari Canal (KM 22 + 161) 18"Ø P/L (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
2
1
2
1
|
100+100=200M
360M
160+160=320M
180M |
| 05 |
Purchase Order #: 508384/55/05
Fateh Shah – 1 to Makhdumpur 4" Dia (Steel Casing)
Jafara Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
124 Rft |
| 06 |
Purchase Order #: 508812/F5/05
Polyethylene Pipeline (4" Dia Steel Casing)
Pir Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
200 Rft |
| 07 |
Order Reference #: SUN CNG 168/2006
12" Ø Steel Pipeline Crossing by HDD at Mehran Highway, Landhi, Karachi for 8" Ø Gas carrier pipe (Completed) |
SUN CNG Total Petrol Pump |
1 |
65M |
| 08 |
Ø 6" 0.25" W.T DN 150 Carbon Steel Pipeline (API5L Gr. B) RBOD Crossing at BHP Zamzama Phase – II Project, DADU (Completed) |
BHP/DESCON |
1 |
170M |
| 09 |
16" Diameter x 0.5" W.T MFM Pipeline (API5LX-46) crossing by HDD method at Upper Gogera Branch Canal, District Sheikhupura, Faisalabad (Completed) |
Pak Arab Refinery Company Ltd (PARCO) |
1 |
120M |
| 10 |
8" dia gas gathering lines between MD13 – 3 and MD 6 - 9 crossing underneath the Shah Minor Canal using Horizontal Directional Drilling (Completed) |
Mari Gas Co. Ltd |
2 |
500 RFT |
| 11 |
Nirli Minor Canal crossing using Horizontal Directional Drilling for 20" dia gas pipeline for 175MW, CCPP at Daharki (Completed) |
Foundation Power Company Ltd |
1 |
84 M |
| 12 |
Crossing of Chandan Wah Canal at Johi Road for 8" 13% Cr. SS Duplex X-65 Gas Pipeline and Fiber Optic Cable/Conduit using Horizontal Directional Drilling System for ZAM – NORTH Pipeline Project (Completed) |
BHP Petroleum (Pakistan) Pty Ltd |
3 |
330M |
| 13 |
Laying of 16" dia pipeline through HDD Method at Masu Wah Canal (Completed) |
FFC/Amtech |
1 |
75M |
| 14 |
Laying of 6" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at BP Haider Deep 01 Rohri Canal Matheri (Completed) |
ENGRO Chemical Ltd |
1 |
150M |
| 15 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Narli Wah Canal (Completed) |
ENGRO Chemical Ltd |
1 |
150M |
| 16 |
Laying of 16" dia x 0.28, w.t. API 5LX52gas pipeline through HDD Method at Mehar Sub Drain (Completed) |
ENGRO Chemical Ltd |
1 |
132M |
| 17 |
Laying of 16" dia gas pipeline through HDD Method at Mari Gas Office Road (Completed) |
ENGRO Chemical Ltd |
1 |
126M |
| 18 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Mari Gas Colony Road (Completed) |
ENGRO Chemical Ltd |
1 |
108M |
| 19 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Mari Gas Check Post Goth Kallo Buro (Completed) |
ENGRO Chemical Ltd |
1 |
84M |
| 20 |
Laying of 12" dia 5L Gr.B casing through HDD Method at Sugar Mill Road (Completed) |
Fatima Fertilizer |
1 |
54M |
| 21 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Water Course Goth Ismail (In-hand) |
ENGRO Fertilizers Ltd |
1 |
150M |
| 22 |
Laying of 14" dia water pipeline through HDD Method at Mari Gas Road (In-hand) |
ENGRO Fertilizers Ltd |
1 |
108M |
HDD EXPERIENCE
| S. NO. |
DESCRIPTION
OF WORK |
STATUS |
CLIENT |
LENGTH |
COMPLETION DATE |
| 01 |
Installation of 16” & 20" Diameter x 0.375" W.T. Gas Pipeline under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Begari Canal Crossing 20" Ø
2) Rohri Canal Crossing 16" Ø
3) KP East Crossing 16” Ø |
Completed
In-hand
Completed |
SSGC |
155M
225M
127M |
04-Jun-07
|
| 02 |
Ø 6" RBOD Crossing at BHP Zamzama Phase – II Project, DADU |
Completed |
BHP / DESCON |
170M |
23-Feb-07 |
| 03 |
Installation of 20" Diameter x 0.438" W.T. Gas Pipeline under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Pat Feeder Canal 20"Ø
2) Frontier Wah 20"Ø
3) Naseer Wah 20" Ø
4) Shahi Wah 20"Ø |
Completed
Completed
Completed
Completed |
SSGC |
222M
108M
120M
156M |
14-Dec-06
|
| 04 |
Re-Routing / Bypass of Mancher Lake Segment of 16" Diameter KMK Pipeline at DADU
1) ARAL WAH 1 Canal Ø 16"
2) ARAL WAH 2 Canal Ø 16" |
Completed
Completed |
PARCO |
168M
132M |
18-Sep-06
|
| 05 |
12" Ø Crossing by HDD at Mehran Highway, Landhi, Karachi for 8" Ø Gas carrier pipe |
Completed |
SUN CNG Total Petrol Pump |
65M |
28-Aug-06 |
| 06 |
Steel Casing (Ø4") for Polyethylene Pipeline
Pir Wah Crossing by HDD in Badin Concession Area |
Completed |
British Petroleum Pakistan Inc. |
200 Rft |
28-Feb-06
|
| 07 |
Fateh Shah – 1 to Makhdumpur
Jafara Wah Crossing by HDD in Badin Concession Area |
Completed |
British Petroleum Pakistan Inc. |
124 Rft |
25-Feb-0 |
|